
Installing new tires, axles, and wheels

Priming the trailer

Adding a fresh coat of red paint

Locating holes for triangle installion
Tank stands and triangles are in place!
Side braces for additional support
Hinges have been added
Pulling the trailer out of the shop in preparation for I-beam installation
Fighting through the cold to bolt down the I-beam
Sending those bolts home!
Aligning the I-beam

Cutting down pieces to make a ramp
Drilling out the I-beam connector
Plumbing installation in a BU parking lot

Cold flow of the Mk V
Preparation for Mk V hot fire test 1

Ready for hot fire!

Electronics check

Top view of the trailer
Guidelines to ensure stability

Radiation shield installation
Ready to begin fueling!
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Previous
Next









