BURPG
Past Projects Sponsor Us
About Us Team History
Horizontal Test Stand Hybrid Intro Project Iron Lotus
Contact Us New Members
Our Team About Us Team History Current Projects Horizontal Test Stand Hybrid Intro Project Iron Lotus Past ProjectsSponsor Us Conact Us Contact Us New Members
BURPG
IMG_1408.JPG
 Installing new tires, axles, and wheels

Installing new tires, axles, and wheels

 Priming the trailer

Priming the trailer

 Adding a fresh coat of red paint

Adding a fresh coat of red paint

 Locating holes for triangle installion

Locating holes for triangle installion

 Tank stands and triangles are in place!

Tank stands and triangles are in place!

 Side braces for additional support

Side braces for additional support

 Hinges have been added

Hinges have been added

 Pulling the trailer out of the shop in preparation for I-beam installation

Pulling the trailer out of the shop in preparation for I-beam installation

 Fighting through the cold to bolt down the I-beam

Fighting through the cold to bolt down the I-beam

 Sending those bolts home!

Sending those bolts home!

 Aligning the I-beam

Aligning the I-beam

 Cutting down pieces to make a ramp

Cutting down pieces to make a ramp

 Drilling out the I-beam connector

Drilling out the I-beam connector

 Plumbing installation in a BU parking lot

Plumbing installation in a BU parking lot

 Cold flow of the Mk V

Cold flow of the Mk V

 Preparation for Mk V hot fire test 1

Preparation for Mk V hot fire test 1

 Ready for hot fire!

Ready for hot fire!

 Electronics check

Electronics check

 Top view of the trailer

Top view of the trailer

 Guidelines to ensure stability

Guidelines to ensure stability

 Radiation shield installation

Radiation shield installation

 Ready to begin fueling!

Ready to begin fueling!

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Previous Next
 Installing new tires, axles, and wheels
 Priming the trailer
 Adding a fresh coat of red paint
 Locating holes for triangle installion
 Tank stands and triangles are in place!
 Side braces for additional support
 Hinges have been added
 Pulling the trailer out of the shop in preparation for I-beam installation
 Fighting through the cold to bolt down the I-beam
 Sending those bolts home!
 Aligning the I-beam
 Cutting down pieces to make a ramp
 Drilling out the I-beam connector
 Plumbing installation in a BU parking lot
 Cold flow of the Mk V
 Preparation for Mk V hot fire test 1
 Ready for hot fire!
 Electronics check
 Top view of the trailer
 Guidelines to ensure stability
 Radiation shield installation
 Ready to begin fueling!
Boston University Rocket Propulsion Group
110 Cummington Mall,
Boston, MA, 02215,
United States
Hours
Current ProjectsSponsorsThe Team
 
BURPGwhite.png